Skid station stage |
Basic configuration |
Aerated ability*104 Nm³/d |
||
Storage quantity | Lower pump quantity | Quantity of gas dispenser | ||
Standard stage 3 | 1*60m³ | 1 | 2 | 1.5-2 |
2 | 2 | 2-3 | ||
Standard stage 3 | 2*60m³ | 2 | 2 | 2-3 |
2 | 4 | 3-4 | ||
Standard stage 3 | 3*60m³ | 3 | 4 | 4-5 |
4-8 | 6-8 | 6-8 |
LNG refueling station
LNG filling station are tanks as the main cryogenic liquid pumps,and fluid machine combination module,according to GB50156-2012 “car design and construction of refueling stations”one
LNG filling station are tanks as the main cryogenic liquid pumps,and fluid machine combination module,according to GB50156-2012 “car design and construction of refueling stations”one,two,three standard station development and design,process reasonable,layout specifications,concise,and too maximize the skid of the factory pre-assembled,a small amount of on-site engineering for large-scale increase in gas demand.